3M Midwest Distribution Center

Dekalb, Illinois

The structure is located on a 21-acre site and features 13,155 square feet of office space and two material storage rooms totaling 77,515 square feet.

Clayco completed construction on a 410,000-square-foot distribution center for 3M in the Park 88 development in Dekalb. The structure is located on a 21-acre site and features 13,155 square feet of office space and two material storage rooms totaling 77,515 square feet. Constructed of precast concrete over structural steel, the facility features additional fire protection, an in-rack sprinkler system, specialized mechanical and electrical systems, and storage areas that house red-label products. The structure serves as 3M’s main Midwest distribution center.

Get In touch

Kevin
McKenna

President, Construction Group,
& Shareholder

+314-658-0747
mckennak@claycorp.com

Key Facts

Project size:  410,000 SF
Client name:  3M
Architect:  Heitman Architects, Inc.

Integrated Company Involvement

CRG

Design-Build Services

2019-11-21T20:16:56+00:00