Confidential Technology Client Data Center

Washington

The pre-engineered metal building includes multiple design efficiencies to enhance the building systems and drive down costs.

This 58 megawatt multi-data center program will be an addition to this technology sector client’s large Pacific northwest campus, servicing the region. The facility’s design includes stand-alone hot aisle containment systems with overhead cooling on a chilled water loop, serviced by an above ground fluid cooler. The pre-engineered metal building includes multiple design efficiencies to enhance the building systems and drive down costs. The building is tracking LEED version 4 for data centers.

Get In touch

Ryan McGuire

Executive Vice President, Corporate Business Unit Leader & Shareholder

+312-239-1293
mcguirer@claycorp.com

Ed Zemaitis

Vice President of Mission Critical Services

+1 312-948-0711
zemaitise@claycorp.com

Alan Lurie

Project Executive, Operations

+1 312-429-0392
luriea@claycorp.com

2021-10-08T19:10:08+00:00