Dow XPS Pacific Northwest Manufacturing Facility

Burley, Idaho

The building construction includes 6” unreinforced slab on-grade, conventional structural steel framing and bar joist roof structure.

Clayco is performed design-build services for a 66,000-square-foot, manufacturing facility producing extruded polystyrene (XPS) insulation for The DOW Chemical Company. The building construction included 6” unreinforced slab on-grade, conventional structural steel framing and bar joist roof structure, insulated metal panel walls, and mechanically fastened 60 mil TPO roof with R-20 insulation.

The Dow XPS project also includes a guard house, full perimeter fencing, and an outdoor product storage yard.