Express Scripts Office and Data Center

St. Louis, Missouri

Featuring a data center with high levels of security provisions and backup systems, the facility was constructed of tilt-up panels over structural steel framing.

Clayco served as both the developer and design-builder on this 234,000-square-foot office and data center in NorthPark, a 600-acre mixed-use collaboration between Clayco and McEagle.

The facility is near the Express Scripts Technology & Innovation Center and the Corporation’s headquarter buildings on the campus of the University of Missouri-Saint Louis. Costing $36 million, this core and shell project was completed on a fast-track schedule. Featuring a 13,000-square-foot data center with high levels of security provisions and backup systems, the facility was constructed of tilt-up panels over structural steel framing. The massive concrete panels measure nearly 60 feet high and 30 feet wide and weigh up to 230,000 pounds.

Get In touch

Tom
Sieckhaus

Executive Vice President

+314-592-2221
sieckhaust@claycorp.com

Innovation Highlights

LEED CS V2.0 Certified

Key Facts

Project size:  234,000 SF
Client name:  Express Scripts
Architect:  Forum Studio

Integrated Company Involvement

CRG

Development

FORUM

Architecture and Interior Design

CONCRETE STRATEGIES

Structural Concrete

2018-06-01T20:32:36+00:00