Georgia Pacific

1 2 3 4 / 4

The structure is made up of precast wall panels, structural steel and has a ballasted EPDM roof system.

Clayco completed a new warehouse and distribution facility for Georgia Pacific. This new facility is being built on 54.35 acres of land in University Park, Illinois. With the warehouse and a main office area of 4,340-square-feet, the combined building will be 996,990-square-feet.

The structure is made up of precast wall panels, structural steel and has a ballasted EPDM roof system. The truck docks, drive aisles and trailer storage are all concrete pavement with asphalt paving at the employee parking lot. In total, there are 100 dock door positions and 2 drive-in doors. HVAC, electrical, fire protection and plumbing scopes of work were designed and installed as design-build.

It was completed in August 2017.

CLIENT

Venture One & CRG

LOCATION

University Park, Illinois

SIZE

996,990 SF

KEY FACTS

  • Architect: Lamar Johnson Collaborative

INTEGRATED BY DESIGN