OG&E Metro Hardening

Oklahoma City, Oklahoma

This project was an addition to OG&E’s existing mission critical facility. The project increased infrastructure and enhanced the physical structure to withstand an EF-5 tornado.

New 3,600-square-foot precast addition that houses two 1,000 amp utility power sources, one 600 KW generator, two 70 ton air cooled chillers and one 225kVA UPS (Owner kept using an existing UPS). Precast structure is designed to withstand an EF-5 tornado. Installed underslab chilled water piping from the new addition to the existing data room. Installed 4 new CRAC units on the existing data floor and removed existing overhead HVAC cooling system.

Get In touch

Ryan McGuire

Executive Vice President, Corporate Business Unit Leader & Shareholder

+312-239-1293
mcguirer@claycorp.com

Ed Zemaitis

Vice President of Mission Critical Services

+1 312-948-0711
zemaitise@claycorp.com

Shelby Gardner

Vice President of Mission Critical Operations

+1 314-591-4486
gardners@claycorp.com

Key Facts

Project size:  3,600 SF
Architect:  Lamar Johnson Collaborative

Integrated Company Involvement

LAMAR JOHNSON COLLABORATIVE

Architecture

2020-04-15T19:06:31+00:00