MANUFACTURING

Total cost of production; time to market; safety and efficiency. Clayco’s approach to design-build construction is to integrate our clients’ business goals at the project level.

By working together early on to develop the optimum manufacturing process, our team will lead the integration of process equipment, building/infrastructure, design and construction.

Leveraging technology from Building Information Modeling (BIM) and daily cost and schedule updating, we design and coordinate real-time while we build; thereby eliminating process waste and getting our clients’ products to the market faster, safer and more efficiently.

Get In touch

Anthony Johnson

Executive Vice President,
Industrial Business Unit Leader

+314-592-2159
johnsona2@claycorp.com

DIMAC Direct
St. Louis, Missouri
Clayco provided an elegant facility which included a corporate office space with executive offices and all the functions related to...
DRS Laurel Technologies
Johnstown, Pennsylvania
The facility includes 112,750-square-feet of manufacturing space and 13,272-square-feet of office space. — Clayco constructed a new manufacturing facility for DRS Laurel...
Frymaster
Shreveport, Louisiana
The facility manufactures stainless steel cooking equipment and other apparatus for restaurants. — Located on a 51-acre site in Shreve Park, Frymaster’s...
Holten Meat Expansion Phase II
Sauget, Illinois
This facility is divided into a temperature-controlled manufacturing area, a distribution zone and an office wing with a laboratory and...
Missouri Recycling/Daimler Chrysler
Fenton, Missouri
The facility includes 28-foot clear-height ceilings, intermodal capabilities, a fiber optic spine, a diesel-powered backup electrical system, advanced ventilation and...
Northwest Mailing Service, Inc.
Chicago, Illinois
— Chicago, Illinois The project includes a new shipping dock area with nine new truck bays. — Clayco transformed a 1950’s-era manufacturing plant into...
Patriot Machine
St. Charles, Missouri
Patriot’s new facility includes 10,000-square-feet of office space and 60,000-square-feet of manufacturing space. — Clayco provided construction services on a new office...
Packaging Concepts, Inc.
St. Louis, Missouri
— St. Louis, Missouri The project replaced two existing Packaging Concepts facilities – the main office and plant at 4971 Fyler and...
Caterpillar Frame Fabrication – Building F
Victoria, Texas
The facility fabricates and machine base frames Caterpillar’s Hydraulic Excavators. — Clayco and BatesForum provided design-build services for Caterpillar’s frame fabrication shop...
Caterpillar DC-3
Spokane, Washington
Built using concrete tilt-up techniques, the facility was completed on a four-month shell construction schedule. — Clayco and BatesForum provided design-build services...