MANUFACTURING

Total cost of production; time to market; safety and efficiency. Clayco’s approach to design-build construction is to integrate our clients’ business goals at the project level.

By working together early on to develop the optimum manufacturing process, our team will lead the integration of process equipment, building/infrastructure, design and construction.

Leveraging technology from Building Information Modeling (BIM) and daily cost and schedule updating, we design and coordinate real-time while we build; thereby eliminating process waste and getting our clients’ products to the market faster, safer and more efficiently.

Get In touch

Anthony Johnson

Executive Vice President,
Industrial Business Unit Leader

+1 314-592-2159
johnsona2@claycorp.com

Patriot Machine
St. Charles, Missouri
Patriot’s new facility includes 10,000-square-feet of office space and 60,000-square-feet of manufacturing space. — Clayco provided construction services on a new office...
Packaging Concepts, Inc.
St. Louis, Missouri
— St. Louis, Missouri The project replaced two existing Packaging Concepts facilities – the main office and plant at 4971 Fyler and...
Caterpillar Frame Fabrication – Building F
Victoria, Texas
The facility fabricates and machine base frames Caterpillar’s Hydraulic Excavators. — Clayco and BatesForum provided design-build services for Caterpillar’s frame fabrication shop...
Caterpillar DC-3
Spokane, Washington
Built using concrete tilt-up techniques, the facility was completed on a four-month shell construction schedule. — Clayco and BatesForum provided design-build services...
HEB Food Processing Plant
San Antonio, Texas
The structure has a 32-foot clear-height and accommodates full meat plant operation including processing of specialty meats and marinating meats. — Clayco...
Project SCL
Summerville, South Carolina
This 240,000-square-foot manufacturing facility is being built by Clayco and will become the first facility in America for the India...
Dow XPS Pacific Northwest Manufacturing Facility
Burley, Idaho
The building construction includes 6” unreinforced slab on-grade, conventional structural steel framing and bar joist roof structure. — Clayco is performed design-build...
Union Seventy Center
St. Louis, Missouri
The Union Seventy Center is a modern, first-class, 161-acre industrial warehouse and distribution campus created by reconfiguring a former General...
General Motors
Wentzville, Missouri
The four projects include a chassis and final conveyor line installation for a new model line; a project to install...
General Motors Corporation
Oklahoma City, Oklahoma
This project included power distribution, HVAC modifications and shop. — Clayco provided modifications and renovations of the training center for General Motors...