INDUSTRIAL

We challenge traditional delivery methods and, instead, design-build for our clients’ increased efficiency and improved productivity.

Clayco’s integrated team of industrial experts sees beyond the walls of the manufacturing, distribution, and food and beverage facilities we design, build and develop. We see to the people, the technology and the collective purpose within the walls.

Get In touch

Anthony Johnson

Executive Vice President, Industrial Business Unit Leader

+1 314-592-2159
johnsona2@claycorp.com

Tetra Plastics, a Subsidiary of NIKE, Inc.
St. Charles, Missouri
Subsidiary of NIKE, Inc. — St. Charles, Missouri This project's attention to detail carries throughout the interior space to create a pleasant work...
Pepsi Cola
St. Louis, Missouri
The facility features technologically advanced production and bottling equipment, including high-speed can and bottle filling machinery, intricate bulk raw material,...
HEB Food Processing Plant
San Antonio, Texas
The structure has a 32-foot clear-height and accommodates full meat plant operation including processing of specialty meats and marinating meats. — Clayco...
SUPERVALU Cold Storage
Champaign, Illinois
The climate controlled area has five separate temperature and humidity zones which are divided into segregated and certified organic produce...
Triumph Group Aerospace Manufacturing Plant
Edgerton, Kansas
This manufacturing facility for Triumph Aerospace will fabricate landing gear for the Airbus family of planes. — Clayco integrated an underground power...
FedEx
Orion Township, Michigan
The single-story building features 45 dock doors, 30-foot clear heights, and a 5,000-square-foot main building. — Clayco completed construction of an $8.9...
Procter & Gamble – Gateway Commerce Center
Edwardsville, Illinois
The 806,400-square-foot facility is the home of P&G’s consolidated regional operations. — Clayco completed construction of Procter & Gamble’s (P&G) $23 million...
General Mills
Social Circle, Georgia
This single-story distribution facility features 32-foot clear heights, an ESFR sprinkler system and tilt-up concrete construction. — Clayco completed a distribution facility...
Craftsmen Industries, Inc.
St. Charles, Missouri
— St. Charles, Missouri Located on a 23.5-acre site, the facility is constructed of painted tilt-up concrete panels marked by a green-tinted...
Whirlpool Distribution Facility
Bridgeton, Missouri
Whirlpool provided the design team with two strict specifications that were adhered to and improved upon through the design-build process. — Clayco...