INDUSTRIAL

We challenge traditional delivery methods and, instead, design-build for our clients’ increased efficiency and improved productivity.

Clayco’s integrated team of industrial experts sees beyond the walls of the manufacturing, distribution, and food and beverage facilities we design, build and develop. We see to the people, the technology and the collective purpose within the walls.

Get In touch

Anthony Johnson

Executive Vice President, Industrial Business Unit Leader

+314-592-2159
johnsona2@claycorp.com

SUPERVALU Cold Storage
Champaign, Illinois
The climate controlled area has five separate temperature and humidity zones which are divided into segregated and certified organic produce...
Triumph Group Aerospace Manufacturing Plant
Edgerton, Kansas
This manufacturing facility for Triumph Aerospace will fabricate landing gear for the Airbus family of planes. — Clayco integrated an underground power...
Toray Aerospace Manufacturing Plant – Alabama
Decatur, Alabama
The facility also supplies carbon fiber for Hubbell Telescopes and satellites, as well as lower-grade carbon fibers for baseball bats,...
FedEx
Orion Township, Michigan
The single-story building features 45 dock doors, 30-foot clear heights, and a 5,000-square-foot main building. — Clayco completed construction of an $8.9...
Procter & Gamble – Gateway Commerce Center
Edwardsville, Illinois
The 806,400-square-foot facility is the home of P&G’s consolidated regional operations. — Clayco completed construction of Procter & Gamble’s (P&G) $23 million...
General Mills
Social Circle, Georgia
This single-story distribution facility features 32-foot clear heights, an ESFR sprinkler system and tilt-up concrete construction. — Clayco completed a distribution facility...
Craftsmen Industries, Inc.
St. Charles, Missouri
— St. Charles, Missouri Located on a 23.5-acre site, the facility is constructed of painted tilt-up concrete panels marked by a green-tinted...
Whirlpool Distribution Facility
Bridgeton, Missouri
Whirlpool provided the design team with two strict specifications that were adhered to and improved upon through the design-build process. — Clayco...
Coleman Distribution Center
Gardner, Kansas
The Coleman distribution warehouse, features a single-story, tilt-up structure with 32-foot clear heights. — Clayco completed constructing a 1,107,000-square-foot distribution facility for...
Chevron Gulf of Mexico Preservation & Maintenance Facility
Houma, Louisiana
The pre-engineered metal warehouse facility sits on a 30-acre site and offers 20,000 square feet of office space and 11...