Creve Coeur Corporate Center

1 2 / 2

In keeping with the architectural theme of the campus, the building is constructed of a gray glass and metal panel curtain wall system over a beam and structural steel frame.

Clayco built the Corporate Center IV, a $30 million speculative office building at Olive Boulevard and Emerson Road in Creve Coeur, Missouri.

Corporate Center IV is a six-story, 227,600-square-foot building attached to a 1,103-space parking garage. The building includes a 16,800-square-foot basement that is leased as storage space and houses mechanical and electrical equipment.

In keeping with the architectural theme of the campus, the building is constructed of a gray glass and metal panel curtain wall system over a beam and structural steel frame. The glass-walled, two-story main lobby features a granite tile floor with inset carpet flooring accented by stonework, wood trim and decorative wall treatments.

The building’s floor plates range in size from 25,900 square feet to 36,000 square feet and are designed for either single-floor users or multiple tenants. Glass-walled offices on the south and west elevations offer a view of the business park’s lake.

CLIENT

Multiple Tenants

LOCATION

Creve Coeur, Missouri

SIZE

227,600 SF / 1,103-space Parking Garage