Crown Enterprises

1 2 / 2

The 360,000-square-foot distribution and office facility for The Fodale Group was finished on a fast-track, four-month schedule.

Clayco completed its second design-build project in Detroit’s I-94 Industrial Park. The 360,000-square-foot distribution and office facility for The Fodale Group was finished on a fast-track, four-month schedule. Clayco previously completed a 305,000-square-foot distribution facility, its first Brownfield project for The Fodale Group. Located in Detroit’s Renaissance Zone, the single-story design-build facility was constructed using tilt-up concrete panels, utilizing existing slabs on site and features 25-foot clear-height ceilings, overhead doors for truck distribution and access to rail service. Lamar Johnson Collaborative designed the office space interior finishes specific to the tenant’s business operations.

CLIENT

Crown Enterprises

LOCATION

Detroit, Michigan

SIZE

360,000 SF

KEY FACTS

  • Architect: Lamar Johnson Collaborative

INTEGRATED BY DESIGN