Project SCL

1 2 3 4 5 / 5

This 240,000-square-foot automotive components manufacturing facility was built by Clayco and is the first facility in America for the India based company.

Located on a 50-acre site at the Ridgeville Industrial Campus in Summerville, South Carolina this 240,000-square-foot manufacturing facility was built by Clayco and is the first facility in America for the India based company. In addition to the facility, 250 parking spaces was included with the site development. The structural system is comprised of steel and tilt-up panels. The plant produces aluminum automotive components.

Strategically located at the intersection of US 78 & SC 27, the industrial campus and new facility provides tenants access to wider mobility throughout the region. The manufacturing facility was the first building on the campus, which will eventually be comprised of three structures in total.

Lamar Johnson Collaborative served as the architect.

CLIENT

Green Hills

LOCATION

Summerville, South Carolina

SIZE

240,000 SF

KEY FACTS

  • Architect: Lamar Johnson Collaborative

INTEGRATED BY DESIGN