WEG Transformers USA
Washington, Missouri
This project is a 462,000-square-foot, tilt-up spec building located in Salt Lake City, Utah, and represents a key addition to the region’s logistics infrastructure.
Delivered in 2024 through a seamless design-build partnership between Clayco and LJC, the facility exemplifies engineering prowess. Over 400 tilt-up panels utilize three distinct mix designs, varied thicknesses, and rich architectural reveals. The finished interior boasts 1.5 million square feet of slab-on-grade polished concrete.
Strategically positioned with direct access to I-215, I-15, I-80, and the Salt Lake City freight airport, the facility also taps into a vast labor pool. With reach to over 60 million customers within a 24-hour haul, it stands as a logistics powerhouse, engineered for speed, scale, and efficiency.