Sears Logistics Services, Inc.

1 2 / 2

The 300,000-square-foot expansion increased the total size of the facility to 1.3 million square feet.

Clayco completed a $7.7 million expansion of Sears Logistics, Inc.’s distribution center in Diversitech Industrial Park in Manteno, Illinois. The 300,000-square-foot expansion increased the total size of the facility to 1.3 million square feet.

Completed in 1996, the single-level addition is constructed of insulated precast wall panels over a conventional metal deck and bar joist framing system. The facility features 35-foot ceilings, advanced lighting and HVAC systems and an ESFR sprinkler system. The expansion added 79 loading and receiving docks to the facility.

CLIENT

Sears

LOCATION

Manteno, Illinois

SIZE

300,000 SF