Canadian Solar Panel Manufacturing Facility

At peak production, this future solar panel manufacturing facility will be capable of producing five commercial panels per minute.

Clayco and Lamar Johnson Collaborative were selected to provide Design-Build and Procurement services to build a 750,000-square-foot solar panel assembly manufacturing facility in Mesquite, Texas. Upon completion, the facility will house six process lines to produce a total of 317 megawatts of solar panel capacity per month.

CLIENT

Canadian Solar

LOCATION

Mesquite, Texas

SIZE

750,000 SF

KEY FACTS

  • Architect: Lamar Johnson Collaborative

INTEGRATED BY DESIGN